ASME B30.23-2005 pdf – Personnel Lifting Systems
ASME B30.23-2005 pdf – Personnel Lifting Systems. (4) verify that the hoisting equipment is set up and maintained within 1% of level during a personnel lift. (5) for hoisting equipment with a boom-attached platform, verify that the platform is attached...
ASME B30.23-2016 pdf – Personnel Lifting Systems
ASME B30.23-2016 pdf – Personnel Lifting Systems. (d) the personnel lift authorizer to only authorize personnel lifting over, under, or in the vicinity of power lines, in accordance with the requirements of Mandatory Appendix I. (e) personnel platforms not to...